As previously mentioned, I am using the Alumiweld product (from Harbor Freight) to "braze" the tube stock to the sheet stock.
Shown below is a picture of my first attempt at the two part pass through assembly. I ended up junking this one as the notch in the lower left corner of the male part just bugged me, so I made another one.
Version 2 of the pass through.
Final installation of the pass through with number 8 machine screws, washers, stop nuts and a new longer rivet (at the 6 o'clock position).
Another view, which also happens to show the existing throttle cable hole in the firewall to the lower left.
I will also point out that I did remove the engine after finishing the preliminary installation (see Firewall Forward, Parts 1 & 2), so no, these pictures are not out of order, despite what it might seem.
Cleaned up and ready to go.
The next Rotax feature to amend was this fuel line (don't remember if it was a supply or return) hole in the firewall shelf. New patch cut, drilled, deburred and ready to install with the Fire Barrier sealant.
No comments:
Post a Comment